Existing Estimates
$1,967.68
Edited On:
Aug 16, 2025
Metal Cost
0.00
Slope Cost
0.00
System Cost
1,967.68
Material Cost
186.78
Labor Cost
60.00
-
Complete -
Edit -
Assign -
More
$1,967.68
Edited On:
Aug 16, 2025
Metal Cost
0.00
Slope Cost
0.00
System Cost
1,967.68
Material Cost
186.78
Labor Cost
60.00
-
Complete -
Edit -
Assign -
More
$1,967.68
Edited On:
Aug 16, 2025
Metal Cost
0.00
Slope Cost
0.00
System Cost
1,967.68
Material Cost
186.78
Labor Cost
60.00
-
Complete -
Edit -
Assign -
More
$1,967.68
Edited On:
Aug 16, 2025
Metal Cost
0.00
Slope Cost
0.00
System Cost
1,967.68
Material Cost
186.78
Labor Cost
60.00
-
Complete -
Edit -
Assign -
More
Estimates Prepared By
| Prepared by | Job Name | Progress | Amount | Deadline |
|---|---|---|---|---|
|
Herman Beck |
|
$ 77.99 | May 15, 2015 |
|
Messsy Adam |
|
$245.30 | July 1, 2015 |
|
John Richards |
|
$138.00 | Apr 12, 2015 |
|
Peter Meggik |
|
$ 77.99 | May 15, 2015 |
|
Edward |
|
$ 160.25 | May 03, 2015 |
|
John Doe |
|
$ 123.21 | April 05, 2015 |
|
Henry Tom |
|
$ 150.00 | June 16, 2015 |